FPP CARRY OUT THE INSTALLATION OF PROCESS VESSELS WITHIN A STATE OF THE ART BEAUTY PRODUCTS FACILITY

To say that this was an extremely tight location was no overstatement.

This install would have been impossible to complete in the way the client needed without detailed planning, the skill of our team and the use of our Versalift rigging trucks.

Each vessel weighed in excess of 9,000kg and had been manufactured to a maximum diameter that would only just pass through the internal doorways of the facility by a few millimetres; in addition the vessels would only pass through the internal doorways in their horizontal form and required rotating to vertical once inside the production hall.

The fact that we were able to carry out this job safely and efficiently was due to the skill of our install team coupled with the detailed knowledge and meticulous planning we brought to the job.