Case Studies

As almost every job is uniquely different from all others and whether the task is large or small we always follow the process of gathering all ‘need to know information’ to develop a safe system of work for carrying out the task.


Quite often space constraints are one of the biggest challenges we face but we pride ourselves in never being ones to let restricted access get in the way of customer delivery.


‘Every picture tells a story’:
 

FPP VERSALIFT IN TIGHT SQUEEZE TO INGRESS PLANT ROOM EQUIPMENT INTO THE BASEMENT AT THE NEW BIRMINGHAM LIBRARY

   

View This Case Study Here
 


FPP CARRY OUT THE INSTALLATION OF PROCESS VESSELS WITHIN A STATE OF THE ART BEAUTY PRODUCTS FACILITY

View This Case Study Here
 


FPP CARRY OUT THE INSTALLATION OF A PROCESS COOKER WITHIN A MONDELEZ PRODUCTION FACILITY AT CHIRK

View This Case Study Here
 


FPP CARRY OUT A CHILLER PACK REPLACEMENT AT A SENSITIVE DATA CENTRE IN TANKERSLEY

View This Case Study Here


FPP PROUD TO BE SELECTED BY BAILEY CARAVANS OF BRISTOL TO TRANSFER THE LARGE PANEL FACILITY FROM BRISTOL TO CLEVEDON

View This Case Study Here
 


FPP CARRY OUT ’16 POINT LIFT’ TO OFFLOAD AND PLACE A NEW CHILLER IN CLOSE PROXIMITY TO CADBURY’S SHOWPIECE VICTORIAN BATHS

 

View This Case Study Here


FPP CARRY OUT MANAGED CONTRACT LIFTS FOR THE OFFLOAD AND ERECTION OF A NEW EVAPORATOR PLANT FOR KRAFT FOODS BANBURY PLANT

View This Case Study Here


 

 

We are proud to be able to say that we continue to serve all of the above clients.
‘We believe that there is no better endorsement of our approach and professionalism than repeat business’

HomeBack To Top