FPP CARRY OUT THE INSTALLATION OF A PROCESS COOKER WITHIN A MONDELEZ PRODUCTION FACILITY AT CHIRK

Conditions don’t really come more complicated than this.

With hardly any headroom available for conventional install equipment to be operated an industrial cooker weighing 6,000kg required ingress under an existing mezzanine and then lifting to a high level through an opening in the floor of the mezzanine.

After gathering all of the information our solution involved the use of one of our Versalift rigging trucks carrying out progressive lifts at the install area to sequentially introduce lifting bolsters under the cooker one at a time.

Finally with 4 lifting bolsters under the load the cooker was able to be lifted to the desired height for the fitting of its support steelwork.

Our client was a little nervous about the lift as they had never seen anything quite like it before but soon relaxed when monitoring the work as it was undertaken.

Another good job delivered for our client, safely, efficiently and to plan.